News

Dosing Station for Temelin Nuclear Power Station 31.01.2013

The organization LAVIMONT BRNO, a.s. duly handed the dosing station over and put it into operation at the Temelin nuclear power station.

The aim of the project was a complete design process, manufacturing and assembly of the dosing station in from of turnkey as well as fulfillment of all the necessary alterations of the affected equipment, structures and systems including inspection and control activities.

Ing. Josef Nejedlý, MBA
Technical director
LAVIMONT BRNO, a.s.