LAVIMONT BRNO, a.s. has been engaged in the field of nuclear power engineering since 1990, at that time as a limited liability company, at present as a joint-stock company. Our staff got their experience in the area of construction of nuclear power stations in the former Czechoslovakia.
We participated in construction of EDU, EBO, EMO as well as ETE where we implemented complete installation of apparatuses, pumps and pipes in the following units: PS 05 repository, PS 06 radioactive waste final processing, PS 21 primary circuit auxiliary systems, PS 22 cleaning of radioactive media, PS 23 emergency systems, PS 27 preparation of chemical solutions, PS 29 cleaning of contaminated waste water. After the ETE construction was finished, we have been participating in the process of maintenance of the nuclear power plant and in investment actions. We ensure project development, production and installation of technology, guarantee tests, inspections and handover of the work to the owner by our team.
We have a team of experienced specialists who participated in construction and maintenance of the power station, we meet high standards of the owner, ČEZ, a.s., we are reliable, competitive and innovative.